U-Cont delivered the whole water and glycol system to factory of WinWinD in year 2009. The delivery included the connections to ibc-container, pumps, piping, valves, mix tank and the logic controller as assembled and introduced. The system can mix 30 – 60 % water-glycol mixture and pump the mixture as portions to cooling system. The logic for this project was made by Siemens.
WinWinD, water and glycol system
Click image for larger view.
